
Bitumen Penetration 200/300
Packing:
New Steel Drum – Jumbo Bag
40 MT ( Two Containers )
FOB BandarAbbas
New Steel Drum
394 USD
Bitumen 200/300 MSDS
Bitumen 200/300 Safety Data Sheet
NavaPetro Bitumen Penetration 200/300 | |
---|---|
Essential Details | Description |
Type | Penetration Grade Bitumen |
Feed Stock | Iran Crude Oil |
HS Code | 27132000 |
Spot Test | Negative (Positive Spot Test is also Available) |
Inspection | Included |
Delivery Term | FOB-CFR-CIF |
Production and Loading Period | Maximum 3 Weeks |
Payment Term | TT Method |
Marking | Marking can be customized based on customer request |
Supply Capacity | 50,000 MT/Month |
Packing | -New Steel Drum |
Bitumen Penetration Grade 200/300 Specifications | ||||
---|---|---|---|---|
Specification | Test Method | Unit | Min. | Max. |
Specific Gravity at 25 °C | ASTM D70 | – | 1.01 | 1.06 |
Penetration at 25 °C, 100g, 5s | ASTM D5 | 0.1mm | 200 | 300 |
Softening Point | ASTM D36 | °C | 35 | 43 |
Ductility at 25 °C | ASTM D113 | cm | 100 | - |
Flash Point | ASTM D92 | °C | - | 230 |
Solubility in Trichloroethylene | ASTM D2042 | wt.% | 99 | - |
After Thin Film Oven Test (TFOT) | Penetration | Change of Mass | Softening Point | - |
- | ASTM D2872 | ASTM D2872 | ASTM D2872 | - |
- | 46 | 0.8 | 11 | - |
Bitumen Penetration 200/300 Packing | ||
---|---|---|
Type | Picture | Description |
New Steel Drum | Different types of new steel drums are available: | |
Jumbo Bag | Two types of jumbo bags are available: |
Purchase Process
The purchase process for bitumen and petroleum products typically follows these steps:
1. Requirement Identification: The buyer determines the type, grade, and quantity of bitumen or petroleum products needed.
2. Supplier Selection: Buyers identify and evaluate reliable suppliers or manufacturers based on quality, pricing, and delivery terms.
3. Request for Quotation (RFQ): The buyer sends inquiries or RFQs to selected suppliers, specifying product requirements.
4. Negotiation and Contract: Pricing, delivery terms, payment conditions, and other logistics are negotiated, followed by a formal purchase agreement or contract.
5. Order Placement: A purchase order (PO) is issued by the buyer to confirm the order with the selected supplier.
6. Quality Inspection and Documentation: Before shipment, quality checks and certifications (e.g., MSDS, test reports) are reviewed.
7. Shipping and Delivery: Products are transported via appropriate methods (bulk tanker, drums, etc.), often following Incoterms like FOB, CIF, or EXW.
8. Payment: Depending on terms, payment is made via Letter of Credit (L/C), TT (wire transfer), or other methods.
9. Receiving and Inspection: Upon arrival, the buyer inspects the goods to ensure they meet quality and quantity standards before acceptance.
10. After-Sales Support: Includes handling any claims, technical support, or warranty issues.

Buy Bitumen 200/300 from NavaPetro.co
As an experienced bitumen supplier in the Middle East, we are ready to supply the bitumen 200/300 at the most competitive price for our esteemed customers all over the world.
For any need to buy bitumen 200/300, fill out the form below, and our sales specialist will contact you within 12 hours.